CGN Group Achieves 500% Capacity Boost with Weihua Ultra-Large Gantry Crane Export

Press release

Overview

China General Nuclear Power Group (CGN) needed a lifting solution for massive reactor components. Weiyuan delivered an 800-ton ultra-large gantry crane, increasing lifting capacity by 500% and cutting assembly time by 60%.

Key Challenges

  • Old 150-ton cranes could not handle new 750-ton components
  • Multi-crane lifts caused costly delays (40+ hours per assembly)
  • High-precision, nuclear-grade operations demanded greater accuracy

Weihua Solution

  • 800-ton main hoist, 100-ton auxiliary
  • Laser positioning (±2mm), anti-sway, remote control
  • Seismic-resistant and triple-safety systems
  • 60m span, 30m under-hook clearance

Project Highlights

  • 28 weeks from contract to operation
  • 500% capacity boost, 60% faster assembly, zero incidents
  • 99.8% uptime; £8.5M annual savings; 70% fewer project delays

Ongoing Support

  • 24/7 monitoring & predictive maintenance
  • Certified safety inspections
  • Rapid-response technical team

Upgrade your facility with Weihua’s nuclear-grade gantry cranes.